180-metre-long tunnel-boring machine in the Zurich-Thalwil tunnel
180-metre-long tunnel-boring machine in the Zurich-Thalwil tunnel, 1998 (Keystone)
An event offers an insight into the history of the NRLA through texts, photos, films and infographics. This document is part of the following events.
Almost unnoticed by the public at large, the Federal Council brings forward the previously postponed construction of the twin-track Zurich-Thalwil tunnel.