1882 - 2021
Beginning of time period
End of time period
-
16. December 2003
Yes to the Ceneri Base Tunnel
-
15. April 2004
The costs
-
17. May 1960
Visionaries
-
31. December 2019
Ceneri, the third base tunnel
-
31. August 2005
Control in the tunnel
-
14. July 1913
Link through the Lötschberg
-
26. November 2000
Geology and surveying
-
31. May 2014
The four-metre corridor
-
Phase 3: 1983 - 1993
Planning and referendum
-
23. May 1957
Rail tourism